Mechanical Engineering
Year
2021
Sponsor
Northrup Grumman

Space electronic validation testing is a crucial part in any space mission. Before being launched into orbit, there needs to be no question that all the components on the ship can survive the duration of the mission. At Northrop Grumman engineers are frequently left waiting for weeks to get their electronics validated at specialized facilities. Our desktop testing suite which consists of a thermal cycling and humidity chamber, shock test, and impact test will allow engineers to validate electronics instantly, even testing several batches by the time the specialized testing facilities are available.

Image Gallery
BET BET BET BET BET

Students

Mechanical Engineering
Mechanical Engineering
Mechanical Engineering
Mechanical Engineering
Mechanical Engineering